Assignment of a deadline to the order
Configuration
1. Click on Post Order Creation in the left menu under the Settings section .
2. Create an event by clicking on Add Event After Order Creation
3. Rename the event in the Name section (e.g. Order Expiration).
4. Click on the Activities button
and select the Assign deadline shipping date option
5. Go to the Configuration section , set the time in the Cut-off time field and select the country in the Timezone field to apply the correct time zone.
6. Select the “Overwrite the deadline shipping date if already set” option to update the shipping date even if it has already been previously set.
7. In the "Country to consider for the holidays" drop-down menu , you can select the relevant country to automatically configure the national holiday dates in the system.
8. To include Saturday and Sunday as holidays in the system, simply select (flag) the two dedicated options in the configuration form.
9. In the “Days to Add” field , specify the number of days to postpone shipments received after the cut-off time.
10. The "Additional Holidays" field allows you to manually add additional holidays that are not included in the default national calendar.
11. Press Save and Close to save the configuration